Ausdrill has delivered two significant projects at Eliwana: crusher pocket access, followed by rail corridors. Both of these projects required meticulous delivery and tight quality control: we provided specialised loading, blasting and timing techniques to keep vibrations and over blast within limits to protect sensitive heritage sites; delivered a perfect crusher pocket opening in the side of a sheer cliff while protecting a nearby dolerite dyke; and completed a 3000 ton concrete pour for a super structure Off Shore Processing facility. Thereafter, expertly blasting within 10 meters of this structure.